summaryrefslogtreecommitdiffstats
path: root/doc
diff options
context:
space:
mode:
authorAtin Mukherjee <amukherj@redhat.com>2018-01-03 14:29:51 +0530
committerjiffin tony Thottan <jthottan@redhat.com>2018-01-12 05:43:49 +0000
commit8679151392e50e1684ed721710f44dd4fbb992b9 (patch)
tree5122212dab8b83991d6f9f1969632596c98a7700 /doc
parent19b74478fc87909b95a6c87ab212f21b79c809f3 (diff)
glusterd: connect to an existing brick process when qourum status is NOT_APPLICABLE_QUORUM
First of all, this patch reverts commit 635c1c3 as the same is causing a regression with bricks not coming up on time when a node is rebooted. This patch tries to fix the problem in a different way by just trying to connect to an existing running brick when quorum status is not applicable. >mainline patch : https://review.gluster.org/#/c/19134/ Change-Id: I0efb5901832824b1c15dcac529bffac85173e097 BUG: 1511301 Signed-off-by: Atin Mukherjee <amukherj@redhat.com>
Diffstat (limited to 'doc')
0 files changed, 0 insertions, 0 deletions